Indoor selection checklist
- Ceiling and mounting
- Power, dimensions and cut-out
- Beam, output and glare
- CCT, CRI and controls
- Required files and delivery window
Resources / procurement evidence
Use these on-page checklists to prepare a better RFQ and read evidence labels correctly. No download or certificate library is implied where a real file has not been published.

Four practical checklists
These are live page references, not links to nonexistent documents.
Evidence-state glossary
None of the three labels is an automatic certification, approval or whole-project claim.
Product images and published specifications are available on this page.
Select the model, finish, quantity and destination for a quotation.
Ask for the document set required for your selected model and market.
Document purpose map
Always match the document to its owner, exact model or version, scope, date and current review status.
| Document | Primary use | Owner to identify |
|---|---|---|
| Datasheet | Published model and configuration fields | Partner or named product owner |
| Drawing | Dimensions, mounting and version definition | Partner or engineering owner |
| Photometric file | Optical calculation for the exact version | Named model data owner |
| Test report | Test method, sample and measured scope | Actual laboratory or issuing body |
| Certificate | Standard and product scope declared by the issuer | Actual issuer and certificate holder |
| Sample record | Reviewed model, configuration and finish version | Buyer, Topeng and partner by agreed scope |
| Packing record | Packing marks, quantities and release condition | Named order and logistics parties |
Document 1
Document 2
Document 3
Document 4
Document 5
Document 6
Document 7
Common questions
Practical answers for product selection, quotation and project coordination.
Catalogue source traces a product family and published data. Scope reviewed refers to a named application or file scope, not automatic model approval.
Check the issuer, holder, standard, covered model and version, date and stated scope.
It remains marked for project confirmation instead of being estimated or promoted as evidence.