Rooms, zones and quantities
Provide the BOQ or room list with fixture type, quantity, mounting, ceiling condition and drawing reference.
Saudi Arabia / hotel and commercial fit-out
Coordinate architectural indoor, decorative feature and selected exterior lighting through one room-and-zone schedule, with product models, samples, documents, finishes and delivery needs kept visible.

RFQ inputs
The review should preserve the designer's line references while exposing missing commercial and technical inputs.
Provide the BOQ or room list with fixture type, quantity, mounting, ceiling condition and drawing reference.
State power, beam, CCT, CRI, voltage, driver, dimming, emergency and control requirements where known.
Name the finish, trim, decorative material, mock-up or sample requirement and the responsible approval party.
List submittal files, sample deadline, delivery sequence, packing labels, destination and target installation dates.
Product and evidence paths
Select products by room task, then carry model and quantity context into the project RFQ.
Review catalogue-backed downlight and spotlight models with published configuration rows.
Open this routePrepare decorative dimensions, finishes, suspension and electrical requirements for project confirmation.
Open this routeOrganise hotel, retail and shared-space requirements by zone before model selection.
Open this routeConnect BOQ review, evidence requests, samples, QC and export handoff.
Open this routeEvidence boundary. Topeng-controlled production and qualified partner-factory integration are separate routes; an item is identified as Topeng-produced in the quotation or submittal only when that record states it. For every complementary item, the responsible manufacturer and document owner remain named in the RFQ record. Published catalogue parameters remain tied to the named model and configuration. Availability, substitutions, project compliance and commercial terms are confirmed only in the written quotation.
Common questions
Practical answers for product selection, quotation and project coordination.
Yes. Keep room or zone, quantity, finish, voltage, control, evidence and delivery needs visible for every line so the package can be reviewed without losing scope.
Send the BOQ or fixture schedule, reflected ceiling plans where available, room list, target finishes, control requirements, project city, target date and document schedule.